Back to all jobs
T

ACMV Engineer x4 (Data Centre/Construction/MNC)

Talent Trader Group

Johor Bahru, Johor, MalaysiaOn-site1y ago
Employment
Full-time

About the role

Key Responsibilities:

  • Design and implement ACMV systems for data centres.
  • Conduct load calculations and optimize cooling efficiency.
  • Oversee installation, testing, and commissioning.
  • Monitor performance, troubleshoot issues, and ensure compliance.
  • Prepare technical reports and risk assessments.
  • Ensure safety, quality control, and regulatory compliance.
  • Support maintenance and post-handover operations.

Requirements

  • Degree in Mechanical or Building Services Engineering.
  • At least 2 years working experience in ACMV/HVAC engineering.
  • Experience in CRAC/CRAH, chilled water, DX cooling, and airflow management.
  • Strong problem-solving and project management skills.

Interested candidates who wish to apply for the advertised position, please click 'APPLY' to submit your application or send in your resume to engg1@talenttradersg.com

EA License No: 13C6305

Reg. No.: R1874608

For candidate who applied for the advertised position is deemed to have consented to us that we may collect, use or disclose your personal information for purpose in connection with the services provided by us.

741,000+ hidden jobs like this

Talent Trader Group and thousands of companies post here first — often days before LinkedIn or Indeed. Your first 5 applications are free; go Pro to apply without limits.

Everything Pro unlocks:

  • Unlimited applications — free stops at 5
  • Track every application in one place
  • Apply straight to the source, one click
  • Save & organize roles you love
  • Roles pulled from company boards before the big sites

Weekly

$9.99
$4.99/week

For an active search. Cancel anytime.

Most popular

Monthly

$24.99
$12.99/month

The smart pick. Save 35% vs weekly.

Lifetime

$99
$49.99once

Pay once. Every future feature, forever.