Back to all jobs
sbenergy logo

Assistant Project Manager - Data Center Construction

sbenergy
Austin3w ago

About the role

<div class="content-intro"><p>Do you want to work with high caliber professionals in a dynamic and growing company? Are you entrepreneurial, hard-working, and collegial? Join us at SB Energy, a leading company backed by SoftBank and Ares pairing cutting-edge innovation with best-in-class execution. Our Mission is to provide reliable, affordable energy at scale to support America’s growing energy demands.</p> <p>Headquartered in Redwood City, CA, SB Energy develops, builds, owns &amp; operates some of the largest and most technically advanced energy and data center infrastructure projects in the United States. Since launching in 2019, the company has rapidly grown into a top-tier integrated platform with over 3 gigawatts (GW) in operation and a multi-GW pipeline of energy and data center infrastructure nationwide. SB Energy also utilizes its strong culture of innovation to identify and incorporate new technology into our projects, including our AI-based digital platform, to deliver energy infrastructure that is local, reliable, and matched to load. We are building the energy and technology future—today.</p> <p>Come join us in accelerating the energy transition to cleaner, more sustainable sources of power!</p></div><p><strong><span data-contrast="auto">Basic&nbsp;Function</span></strong><span data-ccp-props="{&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:0}">&nbsp;</span></p> <p><span data-contrast="auto">We are looking for a detail-oriented and driven Assistant Project Manager to support the successful planning and execution of data&nbsp;center, critical infrastructure, and large-scale MEP (Mechanical, Electrical, and Plumbing) design and construction projects. This is an excellent opportunity for someone with a foundational understanding of construction project management who is eager to grow in a fast-paced, technically complex environment.</span> <span data-contrast="auto">The ideal candidate will have 2–5 years of experience in construction or engineering project support roles, with exposure to data centers or large mechanical/electrical systems preferred.</span><span data-ccp-props="{}">&nbsp;</span></p> <p><strong><span data-contrast="auto">Responsibilities</span></strong><span data-ccp-props="{&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:0}">&nbsp;</span></p> <ul> <li><span data-contrast="auto">Support Project Managers in coordinating design and construction efforts across multiple stakeholders.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:278}">&nbsp;</span></li> <li><span data-contrast="auto">Assist&nbsp;in reviewing and interpreting technical documentation, including architectural plans and MEP specifications.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:278}">&nbsp;</span></li> <li><span data-contrast="auto">Help&nbsp;maintain&nbsp;project documentation, meeting notes, and action items to ensure clear communication across teams.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:278}">&nbsp;</span></li> <li><span data-contrast="auto">Track project timelines, deliverables, and milestones using scheduling tools.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:278}">&nbsp;</span></li> <li><span data-contrast="auto">Assist&nbsp;with budget tracking, invoice processing, and change order documentation.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:278}">&nbsp;</span></li> <li><span data-contrast="auto">Collaborate with internal teams and external consultants to gather and organize project&nbsp;inputs.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:278}">&nbsp;</span></li> <li><span data-contrast="auto">Prepare regular status reports and support the team in presentations and client meetings.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:278}">&nbsp;</span></li> <li><span data-contrast="auto">Help&nbsp;identify&nbsp;potential project risks and escalate issues to the Project Manager as needed.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:278}">&nbsp;</span></li> </ul> <p><strong><span data-contrast="auto">Qualifications/Requirements</span></strong><span data-ccp-props="{&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:0}">&nbsp;</span></p> <ul> <li><span data-contrast="auto">Bachelor’s degree in Construction Management, Engineering, Architecture, or related field; or equivalent industry experience.</span></li> <li><span data-contrast="auto">7+ years of professional experience.</span></li> <li><span data-contrast="auto">2–5 years of experience supporting construction or infrastructure projects.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:278}">&nbsp;</span></li> <li><span data-contrast="auto">Basic understanding of MEP systems, construction sequencing, and project coordination.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:278}">&nbsp;</span></li> <li><span data-contrast="auto">Familiarity with reading construction drawings and technical documents.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:278}">&nbsp;</span></li> <li><span data-contrast="auto">Proficiency&nbsp;with Microsoft Office and project management tools (e.g., MS Project, Smartsheet, or similar).</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:278}">&nbsp;</span></li> <li><span data-contrast="auto">Strong communication, organizational, and problem-solving skills.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:278}">&nbsp;</span></li> </ul> <p><strong><span data-contrast="auto">Preferred Skills</span></strong><span data-ccp-props="{&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:0}">&nbsp;</span></p> <ul> <li><span data-contrast="auto">Experience working on data&nbsp;center&nbsp;or large-scale MEP projects.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:278}">&nbsp;</span></li> <li><span data-contrast="auto">Exposure to budgeting or cost-tracking systems.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:278}">&nbsp;</span></li> <li><span data-contrast="auto">Interest&nbsp;in pursuing PMP certification or formal project management training.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:278}">&nbsp;</span></li> <li><span data-contrast="auto">Familiarity with design-build or fast-track project environments.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559740&quot;:278}">&nbsp;</span></li> </ul> <p><strong>Location: </strong>On-site near Austin, Texas.</p> <p>Base Pay - $140,000-$170,000</p> <p>The pay range mentioned above is a guideline. We tailor each offer based on your unique skills, experience, location, and market benchmarks—while ensuring internal parity across our teams. In addition to competitive base pay, total compensation may include a discretionary annual bonus and a market leading comprehensive health and wellness benefits package. Final details will be discussed during the later stages of the hiring process.</p> <p><strong>Our Health &amp; Wellness Benefits</strong></p> <p>At SB Energy, we invest in our people and their families with benefits designed for flexibility, support, and peace of mind. Full-time employees enjoy:</p> <ul> <li>100% Company-Paid Medical, Dental &amp; Vision (for employees and dependents)</li> <li>401(k) with Company Match</li> <li>Generous Paid Time Off + 11 Paid Holidays</li> <li>12 Weeks Paid Parental Leave</li> <li>Life, AD&amp;D &amp; Long-Term Disability Coverage</li> <li>Flexible Spending Accounts (FSA) for Medical, Dependent Care, Transit &amp; Parking (with company contributions)</li> <li>Mental, Physical &amp; Social Wellness Support (with company contributions)</li> <li>Flexible Work Arrangements &amp; Hybrid Office Setup Benefits</li> <li>Monthly Reimbursement for Phone, Internet &amp; Data</li> <li>Optional Legal &amp; Pet Insurance Plans</li> <li>Device Purchase Support</li> </ul> <p>At SB Energy, the success of our projects is driven by a desire to see our projects benefit as many people as possible. We work to serve local communities through volunteering, fundraising, and much more. For example, we’re proud to support access and opportunity in engineering and clean energy through impactful mentorship programs and workforce training. When you join SB Energy, you can become a part of these efforts, collaborating with team members who share a vision of building a better future now!&nbsp;</p> <p>SB Energy is built on a foundation of collaboration and inclusion. We are proud to be an equal opportunity employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, creed, gender, national origin, age, disability, veteran status, marital status, pregnancy, sex, gender expression or identity, sexual orientation, citizenship, or any other legally protected class.</p> <p>To learn more about us, visit <a href="https://www.sbenergy.com">www.sbenergy.com</a>.</p> <p style="margin: 0in; font-family: Calibri; font-size: 11.0pt; color: white;">#LI-ONSITE</p> <p style="margin: 0in; font-family: Calibri; font-size: 11.0pt; color: white;">#LI-AM1</p>

Perks & benefits

  • 401k
  • Paid Time Off
  • Pension Matching

747,000+ hidden jobs like this

sbenergy and thousands of companies post here first — often days before LinkedIn or Indeed. Your first 5 applications are free; go Pro to apply without limits.

Everything Pro unlocks:

  • Unlimited applications — free stops at 5
  • Track every application in one place
  • Apply straight to the source, one click
  • Save & organize roles you love
  • Roles pulled from company boards before the big sites

Weekly

$9.99
$4.99/week

For an active search. Cancel anytime.

Most popular

Monthly

$24.99
$12.99/month

The smart pick. Save 35% vs weekly.

Lifetime

$99
$49.99once

Pay once. Every future feature, forever.